⚡ Emergency roof repairs 24/7 — Call now: 01789 509542
Homeowner Guide2025-03-136 min read

How to Read a Roofing Quote: What Every Warwickshire Homeowner Should Know

NFRC Registered
Fully Insured
10-Year Guarantee
Free Quotes
No Hidden Costs

A proper Warwickshire roofing quote is written and itemised, naming the specific tile, underlay, fixing method, scaffold provision and guarantee. Verbal quotes and one-line totals are not comparable and invite disputes. Always get three written quotes for major work, and check the specifications match before comparing on price alone.

Most homeowners accept or reject roofing quotes on price alone, without knowing whether the quotes they are comparing are for equivalent work. A £6,000 quote for concrete tiles and non-breathable felt is not comparable to a £7,500 quote for clay tiles and breathable underlay. This guide explains what a complete, honest quote looks like and the questions to ask if it is missing anything.

What Every Roofing Quote Must Include

A fully specified roofing quote — the only kind that allows meaningful comparison — contains all of the following:

NFRC recommends homeowners obtain written, itemised quotations specifying materials and fixing method, and warns that verbal or single-figure quotes prevent meaningful comparison.

— NFRC — advice for homeowners

Comparing Competing Quotes: The Correct Method

Once you have two or three quotes, compare them in this order:

  1. Specification equivalence first: Are they quoting the same material? Same underlay? Same fixing type? If not, adjust for the known cost differences before comparing the total price.
  2. Scope completeness: Does each quote include scaffold, disposal, and guarantee? Add any missing elements at their market cost before comparing totals.
  3. Price last: Once you are comparing equivalent scopes, the price difference is meaningful. A 15% price difference on an equivalent specification warrants a direct question. A 40% difference warrants serious investigation before acceptance.

Red Flags That Should Prompt You to Decline

The Three Questions to Ask Before Signing

"What happens if you find rot at strip stage?" The correct answer: "We photograph it, call you before proceeding, and provide a separate quoted cost for your approval." Any other answer is a red flag.

"Is the price fixed?" The correct answer: "Yes, subject only to structural discoveries documented at strip stage." Legitimate roofers quote fixed prices because they have inspected the property adequately before quoting.

"Can I see your public liability insurance certificate?" The correct answer: the document, provided without hesitation. NFRC members carry minimum £2m public liability and can demonstrate this immediately.

Our Quoting Process

We survey the property first — including a loft inspection to assess felt and batten condition where accessible. We then provide a fully itemised written quote within 24 hours. The quote is fixed price. Any structural discoveries at strip stage are photographed, communicated to you with a clear description, and quoted for your approval before any additional work proceeds. Nothing appears on the final invoice that was not either in the original quote or separately approved in writing.

Need a Quote for Your Stratford Property?

Free surveys across Stratford-upon-Avon and Warwickshire. No call-out fees. NFRC registered.

📞 Call 01789 509542
FAQ

Frequently Asked Questions

A complete quote should include: the specific tile product name, underlay specification, batten specification, fixing type (stainless preferred), scaffold erection and removal, waste disposal, and the workmanship guarantee duration. Without all of these, price comparisons are misleading.

First check that they specify the same material. Then check that both include scaffold, disposal and guarantee. Then adjust for any specification differences before comparing the total. Price comparison is only meaningful when the underlying specification is equivalent.

No. Any job above minor repair level should be quoted in writing with the specification, price and guarantee stated. A verbal quote provides no protection if the scope or price changes once work begins.

A deposit of 10 to 20% to cover materials procurement is normal practice. Over 30% upfront is not standard. Never pay the full amount before work begins on any significant roofing project.

The most common reasons are different materials specified (clay versus concrete, breathable versus non-breathable felt), scaffold included in one but not the other, or different fixing specifications. Ask both roofers to specify their full material list and compare that before comparing the prices.

Get In Touch

Free Roofing Quote — Stratford

No call-out fees. No obligation. Local roofers covering Stratford and Warwickshire since 2003.

01789 509542 ✉ Email Us Instead
📞 Call Now — Free Quote